Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
[WAITING] Different amount of Branch Costs shown
#1
Base Gearcity v2.0.0.14

In the reports (The branch one), the Branch cost for Buenos Aires is $2.509
But when it moves to the city-specific reports for Buenos Aires, the cost is now $2.531
As for the DB, it states $2.531 instead of $2.509.
As for the rest of the counting, it calculates using the $2.509 on the total branch cost for each city, being Branch Cost + (Employees*Wage)
With me having 24 Employees for $20 each, hence why it's $2.989 on the city-specific report

I attached the screenshot and the DB.


Attached Files Thumbnail(s)
       

.zip   SetOne.zip (Size: 8.03 MB / Downloads: 1)
Reply
#2
Sorry, I missed this post.

I couldn't' load your save game because of the mod file. It crashes on me when I override the mod with default files. I tried to duplicate the issue in 2.0.0.15 but I couldn't.

Let me know if you can duplicate this issue again in the latest version.

Thanks.
"great writers are indecent people, they live unfairly, saving the best part for paper.
good human beings save the world, so that bastards like me can keep creating art, become immortal.
if you read this after I am dead it means I made it." ― Charles Bukowski
Reply
#3
Looks like I also can't replicate the problem on Vanilla at all
Reply


Forum Jump:


Users browsing this thread: 1 Guest(s)