Visual Entertainment and Technologies Forum

Full Version: [WAITING] Different amount of Branch Costs shown
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Base Gearcity v2.0.0.14

In the reports (The branch one), the Branch cost for Buenos Aires is $2.509
But when it moves to the city-specific reports for Buenos Aires, the cost is now $2.531
As for the DB, it states $2.531 instead of $2.509.
As for the rest of the counting, it calculates using the $2.509 on the total branch cost for each city, being Branch Cost + (Employees*Wage)
With me having 24 Employees for $20 each, hence why it's $2.989 on the city-specific report

I attached the screenshot and the DB.
Sorry, I missed this post.

I couldn't' load your save game because of the mod file. It crashes on me when I override the mod with default files. I tried to duplicate the issue in 2.0.0.15 but I couldn't.

Let me know if you can duplicate this issue again in the latest version.

Thanks.
Looks like I also can't replicate the problem on Vanilla at all